Towards Martigny, kilometer 0.000
In the large and flat Rhône valley, the line runs along the cantonal road to the CFF-SBB train station of Martigny. The Martigny-Châtelard company has only very modest facilities there. On the way to Martigny is the on-request stop of les Fumeaux (PK 1,145).
In Martigny, the Martigny-Châtelard connects with the CFF-SBB Simplon main line and with the Martigny-Orsières line, also managed by TMR.
![Between Martigny and Vernayaz, the track is electrified by overhead cables. It runs alongside the road.](/photos/2012-33/2012-33l.jpg)
![A Z 800 is passing the halt in Les Fumeaux without stopping, between Martigny and Vernayaz.](/photos/2012-32/2012-32l.jpg)
![This Z 800 is leaving Martigny. Its next stop will be Vernayaz.](/photos/2010-36/2010-36l.jpg)
![A Z 800 is boarding in Martigny.](/photos/2010-35/2010-35l.jpg)
![BDeh 4/4 n<sup>o</sup> 68 in Martigny.](/photos/2011-69/2011-69l.jpg)